Concrete Requirements
| Lift Concrete Requirements | ||||||||||||||||||||||||||
| Before installing your new lift, check the following. | ||||||||||||||||||||||||||
| 1. LIFT LOCATION: Always use architects plans when available. Check layout dimension against floorplan requirements making sure that adequate space is available. 2. OVERHEAD OBSTRUCTIONS: The area where the lift will be located should be free of overhead obstructions such as heaters, building supports, electrical lines etc. 3. DEFECTIVE CONCRETE: Visually inspect the site where the lift is to be installed and check for cracked or defective concrete. | ||||||||||||||||||||||||||
| Specifications of concrete must be adhered to. Failure to do so could cause lift failure resulting in personal injury or death. | ||||||||||||||||||||||||||
| A level floor is suggested for proper installation and level lifting. Small differences in floor slopes may be compensated for by proper shimming. If a floor is of questionable slope, consider a survey of the site and/or the possibility of pouring a new level concrete slab. | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
| CONCRETE SPECIFICATIONS | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
NOTE: All models MUST be installed on 3000 PSI concrete only conforming to the minimum requirements shown above. New concrete must be adequately cured by at least 28 days minimum. | ||||||||||||||||||||||||||